Case Study - Walkie talkie

C

lient

- G

artner

V

alue

- £500 M

illion

S

cope of works

B

rogan

G

roup has

been

contracted

to

provide access and

support

for

the

construction of

the

‘S

ky

G

arden

which

will

be housed

in

the

bulbous

peak

.

20 Fenchurch Street

‘Walkie-Talkie’Tower at 20 Fenchurch Street.

Includes construction of a viewing deck and sky

gardens that when finished will become London’s

highest park.

The scaffolding works started from the south side

of the building, overlooking the Thames, and

progressed northward. Lateral support towers were

installed to both East andWest flanks of the 35th

floor to support the steel fins.

The project was a complex and unique challenge

for Brogan Group providing a specialist design

for what is claimed as ‘the building with more up

top’. The specialised roof Fin structure required

extensive support scaffold structures to be built

overlooking the Thames some 150m above ground

level.

“Brogan have a very productive

approach to working safely on a

high rise building in the city of

london with a slab edge that is at

the limit of the site boundry at a

very high level”

Gary Cornwell, Project Manager-

Gar tner