C
lient
-
mace
living
S
cope of works
T
he
70
m high
building
involved
straight
elevations
for which mastclimbers were
used with masts up
to
50
m
.
in addition
to
mastclimbers
system
scaffold was used
,
on
circular areas of
the
central
spiral
shaped
turret
.
goods and
personnel hoists were
also
provided
.
Victoria Hall
Project comprised a new build student living
accommodation situated near Wembley
Stadium. The structure was a 20 storey spiral
tower with three wings encircling the core of the
building. This presented our design team with
several challenges in order to develop an all-
encompassing access solution.
Scaffold had to be cantilevered and integrated
with the hoist run off towers and in between the
mastclimber locations, whilst following a curved
facade.
“Working closely with the Brogan
Group designers, Contract
Managers and Site Foreman
MACE made cer tain that practical
solutions were developed to keep
the project to the tight programme.
All this was achieved with Brogan
Group maintaining its high health
and safety standards”
Jason Liu,
Construction Manager -
Mace Living