lient

-

mace

living

S

cope of works

T

he

70

m high

building

involved

straight

elevations

for which mastclimbers were

used with masts up

to

50

m

.

in addition

to

mastclimbers

system

scaffold was used

,

on

circular areas of

the

central

spiral

shaped

turret

.

goods and

personnel hoists were

also

provided

.

Victoria Hall

Project comprised a new build student living

accommodation situated near Wembley

Stadium. The structure was a 20 storey spiral

tower with three wings encircling the core of the

building. This presented our design team with

several challenges in order to develop an all-

encompassing access solution.

Scaffold had to be cantilevered and integrated

with the hoist run off towers and in between the

mastclimber locations, whilst following a curved

facade.

“Working closely with the Brogan

Group designers, Contract

Managers and Site Foreman

MACE made cer tain that practical

solutions were developed to keep

the project to the tight programme.

All this was achieved with Brogan

Group maintaining its high health

and safety standards”

Jason Liu,

Construction Manager -

Mace Living