35
34
B
ridges
P
roject
N
ame
: H
alfpenny
B
ridge
, I
reland
The bridge was closed in 2001 for major
refurbishment works. The repairs to this
historic Dublin landmark structure included the
replacement of the railings, decks and parts of
the truss structure.
Our works included providing access to
main contractor Irishenco Construction for
refurbishment works. Scaffold was erected
off sunken barges in the river Liffey, Dublin
Ireland. The project included the encapsulation
of the entire bridge and presented design and
construction challenges.
The river is tidal and the supporting scaffold
had to be constructed off sunken barges on the
river bed.
Project Profiles
R
ailway
P
roject
N
ame
:W
est
K
ensington
, L
ondon
West Kensington comprised of new build
offices and apartments above existing offices.
Work involved erecting independent scaffold
over Railway lines at West Kensington, London
during possession hours.
P
roject
N
ame
: L
eixlip
R
ailway
, I
reland
Works at Leixlip Railway included erecting
access & gantries to the new railway building;
including bridging over the railway lines for
main contractor CLG Developments.
P
roject
N
ame
: E
ast
L
ondon
L
ine
, L
ondon
Our remit for East London Line included the full
scaffold packages for main contractor Carillion,
including internal and external access, loading
bays and safety scaffolding.