System Scaffolding

Using system scaffold saves on labour and as a result installation periods and adjustment is much more efficient and considerable time savings can be achieved.

Brogan Group uses Cuplok system, Haki and Layher:

  • Cuplok system
  • Cuplok system staircases
  • Cuplok loading bay
  • Haki staircase
  • Layher public access staircases

large scaffolding contractor

Benefits include

  • All lifts are boarded Usually 2m lifts
  • Lighter Components that are manufactured for High grade tube are 20% lighter than conventional tube, reducing operative fatigue and increasing productivity
  • Wide range of solutions Bay lengths from 0.6m to 3.0m enable a wide range of solutions
  • Choice of brackets Brackets set internal to the main deck can be 1, 2 or 3 board width and can be changed as necessary without adapting the complete scaffold 
  • It complies to standards It complies to BS EN 12811 standard
  • Flush finish There are no protruding tubes, instead there is a flush finish
  • Less materials There are less components
  • Time and cost saving It is faster to erect, dismantle or adapt by a considerable margin

Enquiries

Get in touch for quotations and more information

Enquiry Form

/

You can get in touch using our contact form below.

To find out about how we process your data, please read our privacy policy.

Send