Case Study - MCWP 4000
City Lofts, Sheffield
Project comprised a 90 metre high single
mastclimber with dual work platforms for all
facade works carried out on the 32 storey
iconic City Lofts located in St Paul’s, Sheffield.
The new build structure at the time was set
to be the tallest tower in Sheffield designed
specifically as an iconic landmark for the city
centre.
C
lient
-
shepherd
S
cope of works
S
upply and
erection of
two
separate
mastclimbing
platforms
running on a
single
90
metre high mast
.
B
oth mastclimber
platforms were
fitted with
2
m high guard
rails and
edge
protection
.
the
lower
platform was also
fitted with an
overhead
roof
protection
.
both
platforms were also
equipped with
1
m wrap around
cantilever
extensions on
one
end
to allow access
into
the
building
and
for works
to
be
carried out
to
the
corners of
the
building
.
6
www.brogangroup.com6
www.brogangroup.com www.brogangroup.com06