C
lient
-
mace
living
S
cope of works
T
he
70
m high
building
involved
straight
elevations
for which mastclimbers were
used with masts up
to
50
m
.
in addition
to
mastclimbers
system
scaffold was used
,
on
circular areas of
the
central
spiral
shaped
turret
.
goods and
personnel hoists were
also
provided
.
Victoria Hall
Project comprised of a new build student living
accommodation situated near Wembley Stadium.
The structure was a 20 storey spiral tower with
three wings encircling the core of the building. This
presented our design team with several challenges
in order to develop an all-encompassing access
solution.
Scaffold had to be cantilevered and integrated
with the hoist run off towers and in between the
mastclimber locations, whilst following a curved
facade.
“Working closely with the Brogan
Group designers, Contract Managers
and Site Foreman MACE made cer tain
that practical solutions were developed
to keep the project to the tight
programme. All this was achieved with
Brogan Group maintaining its high
health and safety standards”
Jason Liu,
Construction Manager -
Mace Living