C

lient

-

mace

living

S

cope of works

T

he

70

m high

building

involved

straight

elevations

for which mastclimbers were

used with masts up

to

50

m

.

in addition

to

mastclimbers

system

scaffold was used

,

on

circular areas of

the

central

spiral

shaped

turret

.

goods and

personnel hoists were

also

provided

.

Victoria Hall

Project comprised of a new build student living

accommodation situated near Wembley Stadium.

The structure was a 20 storey spiral tower with

three wings encircling the core of the building. This

presented our design team with several challenges

in order to develop an all-encompassing access

solution.

Scaffold had to be cantilevered and integrated

with the hoist run off towers and in between the

mastclimber locations, whilst following a curved

facade.

“Working closely with the Brogan

Group designers, Contract Managers

and Site Foreman MACE made cer tain

that practical solutions were developed

to keep the project to the tight

programme. All this was achieved with

Brogan Group maintaining its high

health and safety standards”

Jason Liu,

Construction Manager -

Mace Living