About our CAS Tower

A temporary, multi-purpose structure tied to a high-rise building during construction, CAS towers enable all hoisting facilities to be arranged around and tied to it

When using CAS Tower systems, only the CAS Tower itself is tied into the main structure, providing a common access area for all trades and goods, whilst reducing the need to leave openings for access elsewhere on the building façade. Hoists can then be attached to all three of the open sides of the tower and many CAS towers also incorporate an escape staircase.

Working with a CAS Tower

With minimum interference to the programme of works, CAS towers allow for the transport of materials and personnel to optimum working heights and can be used for structures as high as 300m.

Why Choose Our CAS Tower Systems?

  • We design the most efficient configuration for the programme of works with a choice of hoists to all sides of the tower or a mixture of hoists and bespoke temporary staircases that integrate with the CAS tower system
  • Brogan Group CAS Towers are extremely strong and safe. Towers are manufactured with a rigorous quality manufacturing process and our tower construction is robust. 
  • The tower, along with the ancillary access elements, are designed, inspected and maintained to the highest safety standards by Brogan Group design engineers and in-house maintenance team.

Why A CAS Tower System?

  • Contractors need efficient and fit for purpose access solutions more than ever before due to the reduction in build programs
  • Projects can be completed faster, without compromising quality - CAS towers and hoists make the construction of high-rise structures more efficient in terms of cost, time and money and greatly improve building logistics

Benefits include

  • One concentrated area Hoists and temporary staircases positioned in just one concentrated area 
  • Efficiency Work such as cladding can be carried out more efficiently on the entire envelope of the building 
  • Multi-task Allows for fit out of the lower floors to commence earlier as the building is being constructed
  • Optimise use of floor heights Rapid fit outs enabled as the tower/hoist system allows contractors to fully exploit floor level openings and optimise the use of the floor heights when distributing cladding and installing prefabricated pods 
  • To your requirement Deck level can be set either flush with the slab level or above it depending on requirements

CAS Tower Case Study

Enquiries

Get in touch for quotations and more information

Enquiry Form

You can get in touch using our contact form below.

To find out about how we process your data, please read our privacy policy.

Send