Brogan Group worked with a dedicated Data Centre delivery partner that provides turnkey solutions to clients. The project involved the construction of a single 1-4 storey Central Administration Building and two 2-storey (with mezzanine) data centres.

Each data centre included data halls, admin blocks (comprising of offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures.

Design & Installation

Brogan Group collaborated with the Contractor to devise a unique CAS solution to form The Atlas™ Loading Gantry to service the 2-storey data centres and allow large plant and equipment to be transferred into the buildings for the fit-out.

The Atlas™ loading gantry, is flexible and has a number of benefits over a traditional Scaffold Gantry, including having the ability to tie a number of hoists to the structure, quicker to erect, having a larger weight capacity and with a reduced number of ties to the building.

Equipment of various weights, shapes and sizes could be moved in using multiple methods; cranes, telehandlers and attached Goods Hoists.

A second Goods Hoist was installed external to the Client Administration Building in addition to internal and external Scaffolding being erected. A temporary sheeting was also installed, to offer protection from the elements in advance of the building envelope being fitted.







Other Case Studies

Enquiries

Get in touch for quotations and more information

Enquiry Form

You can get in touch using our contact form below.

To find out about how we process your data, please read our privacy policy.

Send