What Is System Scaffolding

Using system scaffold saves on labour and as a result installation periods and adjustment is much more efficient and considerable time savings can be achieved.

Brogan Group uses Cuplok system, Haki and Layher:

  • Cuplok system
  • Cuplok system staircases
  • Cuplok loading bay
  • Haki staircase
  • Layher public access staircases

These scaffold systems work well as high scale construction scaffolding.

Contact Us today with your project details. 

Benefits include

  • All lifts are boarded Usually 2m lifts
  • Lighter Components that are manufactured for High grade tube are 20% lighter than conventional tube, reducing operative fatigue and increasing productivity
  • Wide range of solutions Bay lengths from 0.6m to 3.0m enable a wide range of solutions
  • Choice of brackets Brackets set internal to the main deck can be 1, 2 or 3 board width and can be changed as necessary without adapting the complete scaffold 
  • It complies to standards It complies to BS EN 12811 standard
  • Flush finish There are no protruding tubes, instead there is a flush finish
  • Less materials There are less components
  • Time and cost saving It is faster to erect, dismantle or adapt by a considerable margin

Enquiries

Get in touch for quotations and more information

Enquiry Form

You can get in touch using our contact form below.

To find out about how we process your data, please read our privacy policy.

Send