One of Dubai's most stunning and instantly recognisable structures

Jumeirah Beach Hotel sits prominently in Dubai with a wave-like design. Not only was the Beach Hotel Jumeirah’s first hotel, it is one of Dubai’s most stunning and instantly recognisable structures that continues to be a favourite to tourists and locals alike.

Located on one of the most impressive beaches in Dubai, if offers relaxed luxury with an array of amenities. The hotel provides a vast amount of accommodation, including 599 renovated ocean-view rooms and suits alongside 19 beachside villas.

With five swimming pools, a selection of restaurants, cafes and bars it is no wonder Jumeirah Beach Hotel is such a popular place to stay. On top of this, it has a private beach, tennis courts, spa facilities and even its own gym.

Hotel awards

2018 Middle East’s Leading Family and MICE Hotel, World Travel Awards

2017 Middle East’s Leading Family and MICE Hotel, World Travel Awards

2015 Ranked at no.5 of Top 15 Hotels in the Middle East, Conde Nast Traveler’s Readers; Choice Awards 2015

2014 Ranked at no.1 of Top 10 Hotels for Families in United Arab Emirates

Installation

We provided the external and internal access scaffolding for the refurbishment of the iconic hotel.

The safety of workers, as always, was paramount to us on this project which is why we worked closely with the client to install a temporary roof for the swimming pool. This was extremely important as anyone working on this area was in direct sunlight during the summer period. A design was implemented that factored in the locations of the support towers.

The scaffold package was required on the beach area of the hotel for the client’s steel structure installation to provide new cabanas on the beach. It was also used for demolition works at the back of the hotel to remove materials.

Various birdcages were erected to support the mast climber and for demolition to a ceiling. We also provided access scaffold for cladding works on the build.

We provided a mast climber to the atrium that was 87m high along with the supply of 100 scaffolders a day to the project in order to meet the client’s tight completion date.







Other Case Studies

Enquiries

Get in touch for quotations and more information

Enquiry Form

You can get in touch using our contact form below.

To find out about how we process your data, please read our privacy policy.

Send