Dubai Electricity and Water Authority (DEWA) Substation project
Dubai Electricity and Water Authority (DEWA) plans to build 3 new 400 kilovolt (kv) over three years which will be added to DEWA's existing 21 substations.
Installation
Brogan Group won the access package that included the installation, modification and dismantling of access platforms that range from 2m to 19m in height. Internal and external platforms were both included in the package.
We worked closely alongside DEWA to assist with their plans and ensure that all their needs were met all the way through to completion of the substation.
Gerard Moore
“Please convey a message of appreciation to all of your team at Brogan for support with both design and operation. The last couple of weeks’ progress has been excellent and we look forward to the same dedication in future”