Our works at Heathrow T5C are ongoing. Pictured below are designed independent scaffolds with lifting points to allow CMF (Custom Metal Fabrications) to install extra steelwork.
The access was provided for a design change and our scaffold allowed for steelworks to be installed without removing the existing wall.