Completed in 2017, Duja Tower in Dubai stands at a height of 191m, with a floor area of 110,380 m2. It is located beside the iconic Sheikh Zayed road that links the seven emirates of the UAE.
Brogan Group Mast Climbers are being used to replace ACP panels on the tower between the 53 floors.
The Mast Climber solution was chosen for the speed of installation and removal, offering significant labour and time savings to the client.