Wembley E05

Our remit includes a number of hoists inluding both goods/passenger and goods only hoists. We are also providing specially fabricated landing bridges due to the distance from the hoists to the building.

We worked extremely closely with the façade contractor throughout the tendering process for Wembley E05. By doing so we were able to ensure that we could make installation modifications to meet their construction plan.

The client required us to supply a filleted deck that would span from the heavy-duty hoist car over the void to the structural slab.

The deck was fabricated to suit the installation of the permanent structure façade cladding elements. This allowed the hoist to operate to all levels simultaneously to the client closing the external envelope.

The fabricated run-offs have been fabricated due to the distance from the hoists to the building. The usual distance is .15m from the building, whereas Wembley E05 has a distance of 1.2m.

Upon completion, Wembley Park regeneration project will provide 7,000 new homes within a 8.8 million sq.ft mixed-use area.

large scaffolding contractor

Project Gallery

Enquiries

Get in touch for quotations and more information

Enquiry Form

You can get in touch using our contact form below.

To find out about how we process your data, please read our privacy policy.

Send