The project specification consisted of the refurbishment of the existing cabinet office buildings. Works included the erection of independent scaffolds to the building perimeter and a 3 storey access scaffold along with scaffold stairs to access the treble stacked site cabins and welfare facilities.
Further to this a separate heavy duty scaffold gantry was erected on the footpath to provide overhead public protection and temporary roofs were erected across certain sections of the roof where sections of the roof were being replaced.
Internal works included the erection of a internal heavy duty birdcage scaffolds which were erected as crash decks for demolition of the floor slabs in addition to this perimeter slab edge double handrails, blockwork scaffolds and internal lift shaft scaffolds were also erected.