Battersea Power Station, Phase 2, London
Brogan Group is supplying the hoist package to the redevelopment of the power station. Hoists were required to overcome the logistic and material needs for the stations extensive perimeter works and internal Turbine Halls. The hoists provided in the package range in size from small goods platforms to fit into confined internal spaces to larger passenger Goods hoists to accommodate the varying challenges of servicing a building complex in size and layout whilst respecting its English heritage status.
Brogan Group supplied in surplus of 30 machines with a total capacity of 69,000kg and combined vertical elevation height of 1,630m to ensure all the various building elements to complete the structure, energy centre and turbine halls could reach the required locations on the 24 hour a day project cycle.