Pictured above is birdcage scaffold that has recently been erected in the main atrium for internal works to Chelsea and Westminster Hospital.
Scaffold to the South elevation of the building has now been dismantled after concrete panels to the existing building were demolished to allow for the two-storey extension to the main hospital building.