Works have begun for main contractor Higgins Construction at the £23.5m residential development project in Blackwall.
Initial work includes the installation of a twin passenger and goods hoist to Alberta House which is 25 storeys. Currently the hoist is up to the 7th floor and will eventually reach the 25th floor with a mast height of 80m.
Following this, other works will include: