Pictured above is the latest images of our mastclimber platforms, and goods and passenger hoists at the £23.5m Alberta House project in Blackwall.
Initial works include the provision of six mastclimbers and one hoist to block C with masts up to 26m high.
Further to this, ten mastclimbers plus a twin hoist again up to 26m high will be supplied to Block B along with six mastclimbers and a hoist to Block A with masts up to 80m high at later stages in the project