Set up Email Alert RSS job feed

1 Apr 2008

Two mastclimbers erected at Burlington Plaza

Two Scanclimber SC 5000 Mastclimbers were recently erected at the Burlington Plaza site to enable stone finishing work and glazing works being carried out there by Stonetech and GIG Glazing respectively.

It took one day and two personnel to erect each machine. The need for tower craneage on site was reduced almost completely as the machines were made up in our Dublin yard and brought by lorry to site. They were assembled on site by hand, piece by piece, with the tower crane used initially only to position the base.


Brogan Group then inducted personnel from both Stonetech and GIG Glazing on the correct and safe use of the machines.

Burlington Plaza is a twin-block development of six and seven stories, located at Burlington Road, Dublin 4. Completion is due at the end of 2008.