Set up Email Alert RSS job feed

9 Aug 2010

Kensington & Chelsea College in Sight

Our current works comprise of the erection a bridged loading platform above the gantry which provides overhead protection for the public in addition to a heavy duty loading bay over the site cabins for materials to be crane loaded.

Other works include the erection of independent perimeter scaffold for brick and block work.