We have recently secured the access package for works to a 7 metre deep-dive pool and are now on site at RSME (Royal School of Military Engineering) Bicester.
Access works to the existing structure consist of a purpose built scaffold guardrail located on the top ring beam around the entire pool, temporary ladder access and main stair access to provide safe access and egress* into the dive pool.
Part of the training facilities at RSME Bicester, the pool will be used as an underwater practical search area.
*Access and egress means the rate or means of entry or exit to a workplace