Brogan Group are providing a combined access solution on a residential tower in Camden, London that requires recladding works.
The 100m tower will see Brogan Mast Climbers installed on all elevations with sliding platforms to allow the installation of new cladding, windows, and a curtain wall.
Running Rails will be attached to the mast units during installation, with a winch to enable panels to be attached and placed in situ, allowing for a safer installation.
A 3.2m x 1.5m 2-Tonne Transport platform based on a gantry on the south elevation will provide additional loading capability for the access works.