Brogan Group are supplying Passenger/Goods Hoists for a new school being built in Shoreditch, London.
The Hoist will operate from the basement to the roof, 21m, with a temporary void formed in the podium slab for the hoist to fit through.
The Secondary school will create 1150 new places and will be the first Passivhaus (a rigorous energy efficient design standard) secondary school in the Tower Hamlets borough.