John Sisk were appointed as main contractor for the refurbishment of the Grosvenor House Apartments on Park Lane in London, transforming the building into a super-deluxe apartment hotel.
Brogan Groups work on the project included erecting external scaffold consisting of a heavy duty gantry along mount street with 2 scaffold stairs, 2 hoist tower scaffolds and a Big-E crane support scaffold erected from the gantry.
Internal work involved erecting independent scaffold to the atrium, with a seperate temporary roof within the atrium. The scaffold was then later dismantled allowing for the floors to be extended into the atrium. The scaffold was then re-erected on a free standing scaffold which was butress tied and a unit beam bridged crash deck was installed to the top floor.
Other internal scafffolds included lift shafts and riser scaffolds along with roof top temporary roofs above the main cores. John Sisk | Apartments | Refurbishment | |